|
|
| |
|
|
| |
The risers were first turned down to 1" shank diameter. Then a shoulder was turned to fit the counterbore in the triple clamp. Drilled and tapped for bolts and finish turned on the clamp end. The sides of the clamp end were milled to a 1" thickness. |
|
| |
|
|
| |
|
|
| |
After parting the top half of the clamps off, drilling and tapping for bolts, then bolting them together with a shim between them (for clamping) the 1" hole iscut for the bars. Bars mounted, really beginning to look lke a bike. |
|
| |
|
|
| |